Velocity deficit profiles for three vertical measurement regions at locations shown in Fig. 19, U∞ = 6.6 m/s: (a) is between first and second turbines corresponding to locations T8–T20, (b) is between second and third turbines corresponding to locations T21–T33, and (c) is downstream of third turbine corresponding to locations T34–T48